On October 17, backhoes were moving earth across the lawns around Richmond Hill's Central Library at Yonge Street and Major Mackenzie Drive. The local site OnRichmondHill posted a photo of the work, and its writer described the planned meadows this way: "It is hard to imagine what this space will be."
For a household near Crosby Park, which the City places at Newkirk Road and Crosby Avenue behind Centennial Pool, that construction site is the nearest edge of downtown Richmond Hill. It is also the middle of a city block being rebuilt around performance. The Richmond Hill Centre for the Performing Arts already has a stage just north of the intersection. The library is adding a stage inside. The new park will add an outdoor amphitheatre with a permanent stage of its own. The two indoor pieces are open this winter. The outdoor piece in between will take another two winters.
What the Dirt on the Library Lawn Becomes
The project is called Dave Barrow Civic Square, after the former mayor who served Richmond Hill for more than 30 years, including as Mayor from 2006 to 2021. Council broke ground on July 15, 2026, at the southwest corner of Yonge Street and Major Mackenzie Drive West, with members of his family in attendance. The City's groundbreaking release calls it the City's sixth destination park and a gateway to the historic Village area.
According to the City, the finished square will include:
- The Richmond Hill Bowl and Bowl Stage, an outdoor amphitheatre with a permanent stage for concerts, movies and community performances
- Illuminated Richmond Hill letters with programmable lighting for civic occasions
- An events lawn that becomes a refrigerated skating rink in winter
- A lower plaza with seating, plus shipping-container structures for concessions and a washroom
- An upper terrace with tables, lighting and bicycle parking
- Natural areas, including a pollinator meadow, a tall grass meadow, a marsh and the existing wooded patches, linked by new trails
- A teaching garden for outdoor learning
- A pathway connecting Major Mackenzie Drive West to Yonge Street and Hopkins Street
The plans keep the existing memorial bench and Dave Barrow's sandblasted quote, "It's all about community."
The City gives two different completion dates. The July release says construction runs from summer 2026 until the end of 2027. The Parks Projects page says late summer 2026 to early 2028, weather permitting. That page also still says construction "will begin soon," even though its heading reads "Construction underway." In practice, the refrigerated rink is not part of this winter or next fall, and by the City's later estimate the square itself wraps up in early 2028.
The Library Came Back Before the Lawn Did
The square is being built "beside the Central Library," and the library has spent the same months on its own rebuild. Richmond Hill Public Library describes its renovation as Central Branch's first major refresh in 30 years. The branch closed from August 4 to September 6 and reopened with limited spaces and hours through September and October. On Monday, October 26, it went back to regular hours.
The renovation page says the work will be finished in late fall. The changes include more than 40% more seating on the third floor, desks and surfaces with built-in power, a new collection of toys and activities for play-based learning, new flooring, an open-concept entryway and three new service desks. The change that matters for this corner is the new third-floor stage, which the library says will turn that floor into an event space for performances, panels and special guests.
The library is already busy. It counts up to 40,000 visitors a month at Central, and says visits rose 20% from 2023 to 2025. The building also has a café, the Creative Studio, a Local History Room and meeting rooms for rent.
| Central Branch, 1 Atkinson Street | Regular hours |
|---|---|
| Monday to Thursday | 9:30 a.m. to 9 p.m. |
| Friday | 9:30 a.m. to 6 p.m. |
| Saturday | 10 a.m. to 5 p.m. |
| Sunday | 12 p.m. to 5 p.m. |
Parking is free, with both underground and outdoor spaces at Central. The library's calendar lists a Creative Studio Open House at Central on Saturday, November 7, from 10 a.m. to 1 p.m.
The Theatre Never Left
The third stage is the oldest. The Richmond Hill Centre for the Performing Arts is at 10268 Yonge Street, just north of the intersection, and its 26.27 season keeps going through the construction. Between publication day and mid-December, the RHCPA Presents lineup includes:
- Thursday, November 5, 8 p.m.: Maryna Krut, Ukrainian indie-folk with the bandura
- Saturday, November 7, 8 p.m.: Matthew Good and His Band featuring Kevin Fox and His String Quartet
- Wednesday, November 11, and Thursday, November 12, 8 p.m.: Classic Albums Live: Billy Joel, The Stranger
- Friday, November 13, 8 p.m.: Trooper
- Sunday, November 15, 8 p.m.: Sophie's Surprise, a circus show set at a birthday party
- Thursday, November 19, 8 p.m.: Miigis: Underwater Panther, contemporary dance and film
- Wednesday, November 25, 6:30 p.m.: The Velveteen Rabbit, with shadow puppetry
- Saturday, November 28, 8 p.m.: Men of the Deeps: Coal Miners Christmas
- Wednesday, December 9, and Thursday, December 10, 8 p.m.: Classic Albums Live: The Beatles, The White Album
- Friday, December 11, 8 p.m.: Five For Fighting with String Quartet
On-site parking at the theatre is free from 8 a.m. to midnight on a first-come, first-served basis. Accessible spaces are in the west lot by the west entrance. From September to June, the box office is open Monday, Wednesday and Friday from 10 a.m. to 3 p.m. It is closed Tuesdays, Thursdays and weekends, except that it opens two hours before every performance.
How the Two Open Buildings Fit Together This Winter
With the lawn fenced off, the library and the theatre are separate stops for now. Here is how their schedules line up:
- Wednesday and Thursday shows overlap library evenings. Central stays open until 9 p.m. Monday to Thursday, so on November 11, 12 and 19, and on December 9 and 10, the library is still open when the 8 p.m. curtain goes up.
- Thursday tickets wait until 6 p.m. The box office is normally closed on Thursdays, so for Maryna Krut on November 5, Billy Joel on November 12 or Miigis on November 19, the in-person window opens two hours before the show.
- Friday shows start after the library closes. Central closes at 6 p.m. on Fridays, two hours before Trooper on November 13 and Five For Fighting on December 11.
- Saturday, November 7, fills both ends of the day. The Creative Studio Open House runs from 10 a.m. to 1 p.m., and Matthew Good takes the main stage at 8 p.m.
- Both buildings have free parking. Central has underground and outdoor spaces, and the theatre's lot is free until midnight.
The order the pieces arrive in shapes the next two years at this corner. The theatre's main stage is already running. The library's third-floor stage is scheduled to be ready when the refresh wraps up this fall. The Bowl Stage and the rink lawn outside come last, by the end of 2027 under the City's original estimate or in early 2028 under the current one. When the square is done, the new path from Major Mackenzie Drive West to Yonge and Hopkins Streets will connect all three.
Our team at Kevin Lin Realty follows changes like the Dave Barrow Civic Square timeline, because new public space at the edge of a neighbourhood affects how Crosby homes are presented and valued. If you would like to know how the corner's next two years fit into your own plans, Request a Complimentary Home Valuation and we will walk you through it.